|
















| |

|
Software for Land Development Professionals |
| |
 |
Carlson Software's
Civil Suite 2010 is a software package made up of:
Carlson Survey 2010, Carlson Civil 2010, Carlson Hydrology 2010 and Carlson
GIS 2010. These four civil-related modular programs, working together,
provide the ultimate civil
package that will help you dramatically increase your
productivity and create better designs.
Here is a complete toolset that
allows you to move into 3D as needed. Get 3D intersection design,
multi-baseline road networks, lot layout, storm and utility analysis and
design, plus much, much more. If you can imagine it, the Carlson Civil Suite
has the industry-leading software tools to make it a reality.
The
Carlson 2010 line of software comes with 64-bit
capabilities, is Windows 7 compatible, & works on AutoCAD®2010
and IntelliCAD®6.6. |
| |
|
|
 |
Here's real-time
kinematic GPS and total station data collection directly in CAD! Carlson
Field enables real-time Surveying in CAD on small Palmtop/Laptop computers.
This Carlson Field 2010 feature is an industry first from Carlson Software.
In addition to
Carlson Field 2010 running on top of any AutoCAD® or Map® versions 2000 up
to and including 2010, Carlson Field comes with built-in IntelliCAD®for no
extra cost with every license of Carlson products. Carlson Field is
available as a modular program of the Carlson 2010 line of office software,
with comes with 64-bit capabilities, is Windows 7 compatible, and works on
AutoCAD®2010
With this program,
you can see what you are collecting, zoom in and out, or pan over. You can
do any basic COGO operation and also any high-level CAD operation. You can
even stakeout building corners, lot corners or any CAD feature by "snapping"
to the CAD entity -- without creating point numbers.
Survey/Civil,
Construction and GIS offices will be able to collect field data entirely in
the CAD drawing, plotting all field data collected in the DWG/DXF format.
|
| |
|
|
 |
Carlson
Survey Desktop (CSD) Release 4.0 is a companion product with
Autodesk® Land Desktop 2008 and LDT 2007
that runs inside Autodesk Land Desktop and is fully integrated with the
Autodesk Land Desktop project environment. (Note for LDT users: If you have
LDT 2004-2006, you need CSD 3, if you have LDT 3, you need CSD 2).
CSD interfaces
with all popular data collectors for download/upload, it edits and adjusts
field data, including SurvNET -- Carlson's Network Least Squares program --
and it supports advanced Field-to-Finish. Additional features include deed
enter and reporting, cut sheets, area adjustments and reports, polyline
tools and streamlined COGO. CSD works seamlessly with our data collection
packages of Carlson SurvCE and CG. It is an ideal product for use by
Autodesk Land Desktop users looking for more efficient and broad survey
functionality. |
| |
|
|
 |
Carlson SurvCE is
the first choice in data collection software with advanced, yet easy-to-use
functionality:
 |
Get the software that supports a wide variety of equipment,
old or new
|
 |
Enjoy excellent, free
(and prompt) technical support |
 |
Be heard - Carlson
listens to its customers' input for new features or drivers for all of its
products |
Carlson SurvCE
combines advanced functionality, ease-of-use, and sheer capability to make
it the first choice in data collection software. Carlson SurvCE is a
complete data collection system for Real Time (RTK) GPS and Total Stations
with in-field coordinate geometry. It supports the widest range of popular
and new release RTK GPS and conventional/ robotic total stations. |
| |
|
|
 |
Powerful
site and road estimating / data prep software that will truly
work for you.
Use Takeoff for
Accurate Estimates
 | Calculate site cut & fill and
topsoil |
 | Differentiate strata volumes –
rock vs. dirt |
 | Accurately determine asphalt
quantity needed in a variety of measurement units |
 | Get precise curb work
calculations |
 | Estimate trenching quantities
|
 | Estimate roadways from
cross-sections |
Use Takeoff Once You
Get the Bid
 | Analyze existing TOPO before you
start |
 | Prepare the design info for
exact staking |
 | Create a 3D model for machine
control |
 | Evaluate for quantity and
quality control |
 | Report volumes as you build
|
|
| |
|
|
More Memory
|